Photos

How to Share Real-Time Location on Google Maps

Simran Mishra

Slide 1 – Share Real-Time Location Easily on Google Maps: Google Maps lets you share your live location in seconds. You can choose who sees it, how long it lasts, and track movement in real time for safety, travel, or meetups.

Slide 2 – Start Location Sharing on Android or iPhone: Open Google Maps, tap your profile icon, select Location sharing, and tap New share. The feature works smoothly on both Android and iOS devices with location access enabled.

Slide 3 – Choose Duration and Sharing Method: Set a time limit like 15 minutes, 1 hour, or choose Until you turn this off. Share directly with Google Contacts or create a link that anyone can open.

Slide 4 – What Recipients Can See in Real Time: People you share with can view your live movement, recent location, battery level, and charging status. They may also receive arrival and departure alerts if enabled.

Slide 5 – Share Trip Progress and ETA: While navigating, use Share trip progress to send your route and estimated arrival time. Sharing stops automatically once you reach your destination for added privacy.

Slide 6 – Manage and Stop Location Sharing Anytime: You can stop sharing instantly by going back to Location sharing, tapping the person or link, and selecting Stop. Desktop users can manage active shares via Google Maps.

Slide 7 – Privacy Tips and Final Takeaway: Always share with trusted people, set time limits, and review permissions. Google Maps’ real-time location sharing is fast, secure, and ideal for safety, travel, and coordination.

Join our WhatsApp Channel to get the latest news, exclusives and videos on WhatsApp

Top 10 Crypto Wallet Development Companies in 2026

Etherscan Issues Security Alert Over Attempted Freshworks System Breach

Top 10 DeFi Lending Protocols Compared by Features and Use Cases in 2026

Top 10 Crypto Exchanges Supporting Multiple Altcoins in 2026

Binance Plans Expansion into 5 Asian Markets After USD 6.3 Billion Heist